The Seligenstadt clinic commissioned us with the comprehensive refurbishment and modernization of the patient rooms on the second floor. Our task was to redesign the existing rooms in line with current health standards and create a patient-friendly environment.
Scope of the work
The refurbishment measures began with the complete dismantling of the existing facilities. Old floor coverings, sanitary facilities, existing supply rails and all furniture were dismantled and disposed of professionally. A key part of the project was the construction of new functional drywalls with embedded supply rails, which significantly optimized the medical technology supply.
When it came to the technical infrastructure, we focused on quality and future-proofing: the entire electrical cabling was renewed and modern nurse call systems and fire protection technology were installed. The wet areas were fitted with high-quality tiles on the walls and floors as well as modern sanitary facilities in accordance with the latest hygiene standards. To ensure a uniform appearance, we carried out painting work on all built-in cupboards and door frames. The new floor coverings with skirting boards and the practical wall protection complete the overall picture. All wall surfaces and ceilings were given a fresh coat of paint to create a bright and friendly atmosphere.
Special challenges
Two key obstacles shaped this project: firstly, the tight time frame, which we were able to master through optimized work processes and considered resource management. Secondly, the structural situation challenged our creativity - the existing sanitary pipes had to be intelligently integrated into the new room concept. We used our technical expertise to develop solutions that met the clinic's high standards both functionally and visually.
The result
The result of the modernization are completely renovated patient rooms that meet the highest functional and aesthetic standards. A particular highlight is the specially designed pre-wall installation with integrated supply rail, which enables flexible and efficient medical care. The renovated rooms create a healing environment for patients and optimum working conditions for staff - in line with the client's wishes and expectations.
Further projects

Komplettmodernisierung einer neurologischen Praxis

Seligenstadt Clinic - Neurological early rehabilitation (NFR) ward

Langen Clinic Patient rooms

Bergstrasse Ortho Center

Modernization project at the Seligenstadt clinic
chore - Quality is our foundation
Get in touch with us
+49 69 6066 4500
info@chore.de