Projects
Modernization of the Orthozentrum Bergstraße in Heppenheim
On behalf of the client, chore carried out the comprehensive modernization of the Bergstrasse Ortho Centre in Heppenheim. The project comprised the complete redesign and modernization of the existing practice rooms as well as an extension with corresponding changes to the floor plan.
Scope of the work
The modernization began with a careful planning phase and the submission of the building application for the extension and the floor plan changes. Following official approval, chore took over the complete construction management of the project. The work initially comprised selective demolition measures with professional disposal, followed by extensive drywall construction, interior plastering and painting work. High-quality floor coverings were laid for the new room concepts and the sanitary facilities were completely renewed.
Particular attention was paid to the creation of a disabled-access WC and the renovation and replacement of all sanitary objects in accordance with modern standards. In terms of the electrical installation, the chore team replaced all switches and sockets and developed a well thought-out lighting concept with a suitable selection and installation of new lights. A particular technical challenge was posed by the electrical connections for the large medical equipment such as MRI and X-ray equipment, which were implemented taking into account special safety requirements such as emergency stop switches.
Special challenges
The modernization of the Orthozentrum presented our team with a variety of challenges: The building is a listed building, which required a particularly sensitive approach to all structural changes. The special structural features due to the existing vaulted cellar had to be carefully taken into account in all conversion measures.
It was a logistical masterstroke to carry out the work while the practice remained open, which required precise planning and smooth coordination of all trades. The relocation and room change of the large medical equipment - MRI and X-ray system - demanded the utmost precision and expertise. The special room requirements for this equipment, including radiation protection and technical infrastructure, were professionally implemented by our experts.
The result
After completion of the work, the Orthozentrum Bergstraße presents itself as a modern and visually appealing practice facility that nevertheless retains the character of the listed building. The new premises meet all the functional requirements of a modern orthopaedic practice and offer an optimal environment for both patients and medical staff.
Further projects

Complete modernization of a neurology practice

Seligenstadt Clinic - Neurological early rehabilitation (NFR) ward

Langen Clinic Patient rooms

Bergstrasse Ortho Center

Modernization project at the Seligenstadt clinic
chore - Quality is our foundation
Get in touch with us
+49 69 6066 4500
info@chore.de