Projects

RheinMain-Med
Conversion of a dental practice into a general practice

general contracting

Complete redesign of an existing practice on Hainer Weg

On behalf of the client, chore oversaw the complete conversion of the former dental practice on Hainer Weg into a modern medical care center (MVZ) for general practice—from demolition work through to handover, ready for operation.


client

RheinMain-Med

location

Frankfurt am Main, Hesse

industry

Healthcare
Request project now
RheinMain-Med: Conversion of a dental practice into a general practice

Scope of the construction work

The renovation required a major overhaul of the existing structure, as the entire technical and spatial infrastructure had to be adapted to its new use. The renovation work was completed in about three months.

Demolition of existing structures

The project began with extensive demolition work, during which the specialized fixtures from the previous dental practice were systematically removed. In particular, the dismantling of the dental plumbing and electrical systems required a high degree of expertise: above all, the removal of the water lines, which was carried out with special care, not only to protect the existing structure but also to eliminate any health risks posed by stagnant water or contaminated sections of the piping.

Disassembly

Plumbing removal

Electrical dismantling

Grandfathering

Adjustment of the floor plan layout

The dental practice’s previous layout was not suitable for the needs of a medical care center. As part of the renovation, the floor plan was therefore completely redesigned: seven treatment rooms, a staff room, a laboratory, a reception area, and a waiting area were created based on a design concept that also takes hygiene requirements into account.

Floor plan layout

Land Use Planning

Usage Plan

Interior Finishes and Surfaces

After the demolition, the interior was completely rebuilt. Drywall and interior plastering work laid the foundation for the new room layouts. Tiles were installed in the relevant areas using materials that meet hygiene standards: low-grout installation, disinfectable surfaces, and wall tiles in all wet areas up to the required height.

Drywall construction

Interior plaster

Tiling

Spatial structure

Plumbing, Electrical Engineering, and Networking

The entire technical infrastructure was completely renovated during the renovation. New plumbing and electrical systems were designed to meet the needs of the medical care center and completely replace the previous dental-specific equipment. In addition, modern network technology was installed to support the center’s digital infrastructure.

Plumbing

Electrical installation

Dental Practice Technology

Fiber-optic connection

Since there was no fiber-optic connection in place prior to the renovation, a fiber-optic line was installed for the first time as part of the project. This laid an important foundation for the practice’s digital operations and ensured that the facility has a future-proof technical infrastructure.

Fiber optics

Network infrastructure

Digital Infrastructure

Specific Challenges and Potential Solutions

Land-use changes involving major interventions

01

Converting a dental practice into a general medical facility is no ordinary renovation project. Dental practices have a very specific technical infrastructure—from the water supply to the electrical wiring—that is designed for a completely different purpose. The complete demolition and subsequent new installation therefore required not only technical precision but also a deep understanding of the specific requirements of both types of practice.

Added to this was the challenge of redesigning the floor plan so that all areas necessary for the medical center’s operations could be arranged in a functional and efficient manner.

Tight schedule

Despite the extensive scope of work and the complexity of the change in use, all tasks were completed on schedule within approximately three months—thanks to structured project planning and the chore team’s well-coordinated processes.

02

RheinMain-Med: Conversion of a dental practice into a general practice

Turning old stock into modern infrastructure

Now that the renovation is complete, the former dental practice has been transformed into a modern medical care center with a completely renovated and state-of-the-art technical infrastructure. With seven treatment rooms, a laboratory, a staff area, and an inviting reception and waiting area, the renovation creates the ideal conditions for the practice to operate smoothly—for both the medical staff and the patients.

Request your own project now

From dismantling to handover, chore provided structured support at every step. We were able to focus on the opening because we no longer had to worry about the renovation.

Other healthcare projects

Discover more healthcare projects that we have successfully completed as an experienced partner in hospital and healthcare construction.

chore - Quality is our foundation

Get in touch with us

Do you have any questions about us, our range of services or would you like individual advice on your construction project? We will be happy to help you personally. Just give us a call or send us an e-mail!

+49 69 6066 4500

info@chore.de